Tuesday, 6 July 2010

Twelfth week

1. Looked on how blockwork is carried
2. Carried tests on concrete

Eleventh week

1. Looked at the installation of fly tables
2. Looked at the slab and shear wall formwork installment

3. Looked on how plastering is carried on

Tenth week

1. Looked closely at beams installation
2. Looked at shear wall cage preparation

Ninth week

1. Attended slab casting
2. Looked closely on the way post-tension is installed
3. Looked closely at the installation of a column

Eighth week

1. Joined planning department
2. The floor is finished in 6 days
3. Logbook explains in details

Seventh week

1. Leveling using GPS

2. Leveling using Total Station


Sixth week

1. Check final plastering

2. Checking block works